The presented study analyzes the issues related to the organization of construction production during the demolition of buildings for housing and civil purposes in the conditions of renovation of urban areas. The main issues in this case are the analysis of the initial data of the pre-design stage, the selection of tools, machines, mechanisms. In addition, it is important to analyze the factors influencing the technical and economic indicators and applied technologies.
Keywords: demolition and dismantling of buildings, organizational and technological solutions, technical and economic indicators of work, a group of influencing factors, technical condition of a building, construction waste
This article examines the existing methods of organizing construction production, such as: sequential, parallel, flow, and flow-operational, flow-dismembered and flow-complex methods. The features of their formation and differences in the parameters of the duration of construction and the use of resources are determined. Considered and analyzed one of the key and main processes in the organization and planning of construction - the formation of flows. Methods for determining the sequence of construction of complexes of buildings and structures and methods for their optimization, which are aimed at achieving the final result - putting into operation a complex of objects with the required quality and on time, are investigated. As a result, it was concluded that the decisions and methods adopted in the process of developing organizational and technological solutions should ensure the continuity of construction production, competent management of all resources, correct interconnection of all types of work and their execution on time.
Keywords: organizational and technological solutions; integrated construction; сonstruction production; planning; work organization methods; complex flows; construction duration