×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

Implementation of a Conceptual Framework for Evaluation of Construction Control and Supervision for Operations at Construction Sites

Abstract

Implementation of a Conceptual Framework for Evaluation of Construction Control and Supervision for Operations at Construction Sites

Zhou B., Baulin A.B.

Incoming article date: 21.04.2025

This article presents a conceptual framework for assessing the maturity of construction control and supervision systems at construction sites. A multi-level assessment model has been developed, integrating the Analytic Hierarchy Process (AHP) and fuzzy comprehensive evaluation method. A five-level taxonomic system for grading the maturity of regulatory mechanisms in the construction industry is proposed. The procedures for forming a hierarchical structure of assessment indicators, constructing judgment matrices, determining weight coefficients, and applying the fuzzy comprehensive evaluation method to quantify the maturity level of supervision systems are described in detail. The developed methodology represents a universal tool for conducting comparative analysis of construction control and state supervision systems in various national and regional jurisdictions based on objective quantified criteria.

Keywords: construction control, state supervision, maturity model, Analytic Hierarchy Process, fuzzy comprehensive evaluation, quantification, assessment indicators